Cellular Sites – The OIT is developing a white paper on cellular sites
that will serve as the starting point for a campus-wide discussion on the
placement of cellular sites on campus.
-
Telephone
Switch – our new NEAX2400 IPX telephone switch has been in operation
since August 10, 2002, but we have not yet accepted it due to issues of
contract performance.
-
ONI
– We are trying to get started on the last construction piece of our
first last mile project. We purchased fiber materials from Level(3) to make
sure that we match their specifications, and they ended up giving us twice
what we ordered, so we should have enough fiber for both of our last mile
projects. Over the holidays we moved equipment and fiber terminations in
our switchroom to prepare for the arrival of the 15808 equipment sometime
in April. We are now working on the electrical requirements.
-
Intrabuilding
Wiring Projects – By April we should have completed all our Phase
I projects. We have made significant progress on 12 of our 26 Phase II projects.
-
Next
Generation Backbone – we used 802.11b wireless equipment to provide
a backbone connection to an off-campus building. we're using 128-bit WEP
with a pre-standard version of TKIP to provide automatic key rotation, as
plain WEP is not adequate. During this implementation we ran into a couple
of problems related to VLANs: the initial wireless equipment that we deployed
didn’t support Ethernet frames large enough to support VLAN tags.
Our current wireless equipment requires an untagged link for management
purposes, and the Foundry BigIron 4000 does not fully support both untagged
and tagged VLANs on the same link.